Enter any US address to see the nearest substation and high-voltage power line, how far they are, whether the spot is in a flood zone or wetland, and whether your land could host a battery storage project. It's free, instant, and no sign-up is needed.
How It Works
The nearest high-voltage line and its voltage. Higher-voltage lines can carry bigger battery projects, and closer lines mean a cheaper connection.
Most storage projects connect at or near a substation. Land within about 2 miles of one is in high demand.
How much the grid in your state needs storage, based on peak demand, solar and wind growth, and state targets.
Whether the spot is in a FEMA flood zone or a mapped wetland. Both are common reasons a site is turned down.
Enter your address above. The Land Check searches public power-grid maps and shows the nearest substation, its voltage when known, and the distance from your property.
The strongest sites are within about 1 mile of a high-voltage line (69 kV or more) or within 2 miles of a substation. Closer is better, because building a new power line is the largest cost of a project.
It uses US government (HIFLD) transmission-line data, with substations from OpenStreetMap when available, plus the utilities' own hosting capacity maps in New York, Massachusetts and Minnesota. It covers high-voltage lines well but may not show smaller distribution lines. Capacity figures are typical ranges by voltage. A full evaluation confirms the details with the utility.